国产日韩欧美精品,国产免费一区二区三区在线能观看,国产一区高清在线,美女久久久久久久久久久,女教师一区二区,日韩欧美综合久久,欧美一区二区免费在线

?
 
HOME PAGE |  SERVICES |  CONTACT
>

【News】Our company's "One Belt and One Road" third batch of ship construction successfully concluded

        On January 4, 2024, our company undertook the three ships for the "Belt and Road" national energy major project of COSCO Shipping Bulk Cargo Transportation Co., LTD. - Guinea aluminum mining project supporting the 112m transfer platform, 75m supply & repair vessel, 3088kW ASD tug delivered on schedule on the same day and successfully set sail. It marks the completion of the construction of all ships in the third batch of the project and a successful conclusion, achieving a good start in the New Year's production.

112米轉運平臺-壓縮.jpg

        The 112m transfer platform has a total length of 112m, a width of 30m, a depth of 7m, and a maximum draft of 4m. It can transport more than 40,000 tons of ore per day, doubling the output capacity of the project.

75米維修補給船-壓縮.jpg

        With a total length of 75m, a width of 19m, a depth of 5.5m, and a maximum speed of 10kn, the 75m supply & repair vessel adopts a dual-engine, dual-paddle (FPP) propulsion device, which can provide fresh water supply, material support, anchorage service and other support services for the same batch of 112m crane ship and 78m floating crane ship.

全回轉拖輪-壓縮.jpg

        The total length of 3088kW ASD tug is 37m, the width is 10.2m, the depth is 4.5m, the forward towing force is 52t, the backward towing force is 47t, and the speed is 13kn.

Copyright (C) 2010-2025 zjshipyard.com. All Rights Reserved 
ddress:No.8 Jingjiang Road ZhenJiang City Jiangsu Province  Tel:0086-511-85637101 85637218  Fax:0086-511-85637107