国产日韩欧美精品,国产免费一区二区三区在线能观看,国产一区高清在线,美女久久久久久久久久久,女教师一区二区,日韩欧美综合久久,欧美一区二区免费在线

?
 
HOME PAGE |  SERVICES |  CONTACT
>

【Steel Cutting】Steel Cutting for The First Domestic Diesel-Electric Parallel Hybrid ASD Tugboat

開(kāi)工1.jpg

        On 25th of Aug.,2022,one unit of 5000HP (3680kW) Diesel- Electric Hybrid ASD tugboat has been carried out the steel cutting,which is designed and built by our shipyard for Ningbo Oil Handling & Tug(Barge)Co., Ltd.

        The ship designed uses diesel-electric parallel hybrid system,it through the working condition optimization of the hybrid system and energy scheduling to achieve energy conservation and emissions reduction, and also can reflect the energy saving effect of mixing, and after the tug to emission control area, the electric energy in the storage battery can realize zero emission in the control areas. After the implementation of the project, it will become the first domestic diesel + electric parallel hybrid tugboat, and fill the gap in China.

        Lu Juncheng,general manager of Ningbo Oil Handling and Tug(Barge)Co.,Ltd,and other relevant leaders attended the Steel Cutting Ceremony.

Copyright (C) 2010-2025 zjshipyard.com. All Rights Reserved 
ddress:No.8 Jingjiang Road ZhenJiang City Jiangsu Province  Tel:0086-511-85637101 85637218  Fax:0086-511-85637107